Home »

Grounds Development Progress

05 October, 2020

The drainage works on the main pitch at Páirc Uí Mhurchú and works are progressing at pace. The perimeter drain has recently been completed along with the carrier drains. The carrier drains span across the width of the pitch outside of both side-lines and exit into the perimeter drain.

Works have now commenced on constructing 12.5km of a gravel band drain. These drains run 90 degree angles to the carrier drains and run the length of the pitch.

Web Design by Granite Digital